The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a fullrenovation of B454 into the new Wash Rack. Perform all work according to this Statement of Work (SOW), the100% Design, 100% Specifications, and all related AF requirements and other codes and references. Constructionmust be accomplished in accordance with applicable UFC`s, ETL`s, (UFC`s and ETL`s may be found on–line atwww.wbdg.org.) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices(Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW.
↧