Quantcast
Channel: RFPMart - Mississippi RFPs
Viewing all articles
Browse latest Browse all 4571

CSE-5077 - USA (Pontotoc, Mississippi) - Video Surveillance System - Deadline April 17,2019

$
0
0
Posted Date : March 19,2019
Product (RFP/RFQ/RFI/Solicitation/Tender/Bid Etc.) ID : CSE-5077
Government Authority located in Pontotoc, Mississippi; USA based organization looking for expert vendor for video surveillance system.
[A] Budget: Looking for proposal
[B] Scope of Service:
(1) Vendor needs to provide video surveillance system to the government authority located in Pontotoc, MS.
1) Scope
a) Contractor shall provide and install stationary/adjustable cameras, control equipment, central recording system, connections, wiring/cabling, software and any/all other required hardware for a complete video surveillance system to provide acceptable coverage for areas noted on attached site maps.
b) Provide appropriate indoor and outdoor UV resistant wiring or cabling or connection to/from all cameras and fixed equipment.
c) Proper grounding and surge protection shall be provided & installed with all video surveillance equipment.
d) All equipment shall be mounted according to mfg. recommendations. All interior equipment shall be rack mounted or mounted into a cabinet, appropriately sized for the equipment provided.
e) All cabling, wiring, connectors, connection points, etc., shall be sealed to prevent moisture or corrosion issues.
f) All cabling, wiring, connectors, connection points, etc., shall be neat, orderly, and labelled as necessary for troubleshooting purposes.
g) All cabling, wiring, connectors, connection points, etc., shall have proper strain relief.
h) Ethernet and/or any cabling runs over 50ft shall be provided by low-loss cabling and potentially include amplifiers to prevent any degradation of signal loss.
i) Any wall penetrations shall be neat, as compact as possible, sealed and entry boots shall be provided as necessary.
j) Contractor is responsible for providing power, via power supply and/or POE to all equipment.
k) Contractor shall make arrangements with the utility company for use of utility poles.
l) If additional mounting poles are required; the contractor shall identify/furnish/install and the cost shall be included in the proposal.
m) Contractor is responsible for thorough site review and educated recommendations on all equipment locations.
(2) Contract period will be for one year.
[C] Eligibility:
- Onshore (USA Only);
[D] Work Performance:
Not Applicable
Budget :
Deadline to Submit Proposals: April 17,2019
Cost to Download This RFP/RFQ/RFI/Solicitation/Tender/Bid Document : 5 US$

Viewing all articles
Browse latest Browse all 4571

Trending Articles