Posted Date : June 29,2021
Product (RFP/RFQ/RFI/Solicitation/Tender/Bid Etc.) ID : EQU-5779
Government Authority located in Columbia, Missouri; USA based organization looking for expert vendor for vibration monitoring system.
[A] Budget: Looking for Proposal
[B] Scope of Service:
(1) Vendor needs to provide vibration monitoring system and digital display for a replacement of the electronic modules and display only, current sensors must be reused with the new system,
- This system is currently installed on a GE 35 MW, 3600 RPM, 15 stage Steam Turbine Generation unit powered by a Gas fired 1969 B&W Integral Furnace Bent tube Boiler rated at 342,000 lb/hr , 1050 PSI, power supply, dual thrust monitor, vibration monitor, eccentricity monitor, digital tachometer, differential expansion, complimentary input case expansion indicator and valve position indicator, etc. to the government authority located in Columbia, MO.
(2) All questions must be submitted no later than July 8, 2021.
[C] Eligibility:
Onshore (USA Only);
[D] Work Performance:
Performance of the work will be Offsite. Vendor needs to carry work in their office location.
Budget :
Deadline to Submit Proposals: August 04,2021
Cost to Download This RFP/RFQ/RFI/Solicitation/Tender/Bid Document : 5 US$
Product (RFP/RFQ/RFI/Solicitation/Tender/Bid Etc.) ID : EQU-5779
Government Authority located in Columbia, Missouri; USA based organization looking for expert vendor for vibration monitoring system.
[A] Budget: Looking for Proposal
[B] Scope of Service:
(1) Vendor needs to provide vibration monitoring system and digital display for a replacement of the electronic modules and display only, current sensors must be reused with the new system,
- This system is currently installed on a GE 35 MW, 3600 RPM, 15 stage Steam Turbine Generation unit powered by a Gas fired 1969 B&W Integral Furnace Bent tube Boiler rated at 342,000 lb/hr , 1050 PSI, power supply, dual thrust monitor, vibration monitor, eccentricity monitor, digital tachometer, differential expansion, complimentary input case expansion indicator and valve position indicator, etc. to the government authority located in Columbia, MO.
(2) All questions must be submitted no later than July 8, 2021.
[C] Eligibility:
Onshore (USA Only);
[D] Work Performance:
Performance of the work will be Offsite. Vendor needs to carry work in their office location.
Budget :
Deadline to Submit Proposals: August 04,2021
Cost to Download This RFP/RFQ/RFI/Solicitation/Tender/Bid Document : 5 US$